Identify what starts each step
Ask what must be confirmed before the supplier can place the order. This might include a measurement, model selection or a site check. Then ask whether the stated lead time ends at supplier availability, arrival at a collection point or delivery to the site. A product date does not establish an installation date unless the installer confirms it.
Explain any site schedule you are trying to meet and what dates are flexible. If another trade must adjust the floor or finish first, tell the provider before asking when the door can be fitted. Ask who checks the received unit before work at the opening begins.
- Mark product arrival and installation as separate dates.
- Note which dates are estimates, expectations or confirmed arrangements.
- Ask when and with whom to follow up if a provisional date has not been replaced with a confirmed one.
Know which person to ask for an update
Name the contact responsible for each stage. If a selection, site condition or expected date changes, update the quote request so the supplier can explain which other stages it affects.