Give the provider a list of the old parts
Say whether the work is expected to remove a leaf only or the frame, threshold, trim and hardware as well. Label any piece you want to keep. If several doors are being removed, give each a room or location reference. State whether the installer can access the opening and the route out without another contractor doing work first.
Ask if the proposed price includes taking the material out of the building and removing it from the property. If part of the work would be handled separately, record who will do it. Share any loading or shared access arrangements already confirmed.
- Ask whether any old item stays on site after fitting.
- Get separate prices or descriptions for removal, carry-out and disposal where needed.
- Tell the provider which other removed materials someone else will keep or collect.
Confirm what the proposal leaves behind
Find out who will collect any retained parts and whether any finish work remains once the old unit is removed. Ask the provider to state any unresolved condition or task before you agree to the quote.