Mark the doorway on the current plan
Give the doorway a label and show which rooms or spaces it connects. Attach the latest drawing if one exists. Mark the planned swing, what lies beside it and where the inside and outside finish surfaces will be. Identify dimensions as planned rough opening, unit size or another named basis. Note the planned floor surface and jamb depth if known. If the opening has yet to be sized for a specific door, write that clearly.
Show the boundaries of the door work
Identify who is building and checking the wall opening and which work the door quote should include. Ask for the proposed assembly drawing and the opening details required for it. If the plan has a transom, sidelights or an adjoining panel, show whether they are part of the same unit. Point out changes that are still being considered, such as a different floor finish or another swing. Ask who will verify the final opening once the plan is settled.
Match the quote to a drawing version
Record the drawing date and identify any decisions that are still open. Keep any earlier opening dimensions apart from the current plan.